The inaugural Environmental, Social, and Governance (ESG) Report for New Terminal One at John F. Kennedy International Airport, titled From the Ground Up, examines sustainability initiatives supporting the development of a major international airport terminal in New York. The report evaluates climate-resilient infrastructure, renewable energy, greenhouse gas emissions management, construction waste diversion, water conservation, occupational safety, workforce development, supplier diversity, community investment and responsible financing. Developed as part of JFK Airport's US$19 billion redevelopment programme, the project aims to integrate environmental efficiency, social inclusion and strong governance into terminal construction and future operations.
The 56-page report covers January 2024 through June 2025, with selected procurement information extending to September 2025. Prepared with support from Schneider Electric's sustainability advisory services, it references the Global Reporting Initiative (GRI) Standards and United Nations Sustainable Development Goals. Its reporting boundary covers Phase A construction and preparations for future operations, excluding other JFK terminals. Construction waste figures undergo third-party consultant review and Port Authority oversight, while supplier diversity and workforce information are subject to defined verification procedures. The report emphasizes infrastructure specifications, construction performance and future operational commitments rather than a complete operational emissions inventory.
The New Terminal One reported diverting 97% of construction waste from landfills, exceeding the Port Authority's 90% requirement, with more than 288,000 tons recycled since 2023. Its planned microgrid includes a rooftop solar installation with up to 7.7 MW of generation capacity and six fuel cells providing 2.76 MW of additional capacity. A rainwater harvesting system is designed to capture at least 50% of rooftop runoff. The project also reported more than US$1.2 billion in contracts awarded to Minority- and Women-Owned Business Enterprises and over US$500 million awarded to local businesses. Community investments exceeded US$1.72 million, while green bond issuance during 2024–2025 totaled US$3.92 billion.
The findings demonstrate how sustainable infrastructure financing, energy resilience, construction resource efficiency and inclusive procurement can contribute to responsible airport development. The terminal is pursuing LEED Gold certification and plans to deploy a centralized all-electric ground support equipment fleet. Its long-term commitments include an 80% reduction in Scope 1 and 2 greenhouse gas emissions by 2050 against a 2006 baseline and recovery of at least 60% of available aircraft de-icing fluid. However, the emissions baseline remains under development, operational emissions data were unavailable, and several environmental outcomes depend on future implementation. The report also contains minor inconsistencies across selected workforce and safety indicators, emphasizing the importance of interpreting the results within their reporting boundaries. Access the original full report here: click here.
Official Report Source
Report: From the Ground Up - The New Terminal One at JFK 2024/2025 ESG Report
Published by: The New Terminal One at JFK International Airport
Edition: Inaugural ESG Report
Publication date: June 11,2026
.png%3Falt%3Dmedia%26token%3D5da3db40-6d0a-4cb7-9f4a-116a8584b174&w=3840&q=100)




.png%3Falt%3Dmedia%26token%3Db068dc33-4764-4d57-a516-d75b75ceaba3&w=1920&q=90)